08/12: Operation report 2008/08/12 a.m.
Category: Operation Report
Posted by: seeds master
Hello.
We had 2 passes in this evening.
We finished downlink the sensing data of 30 minites after separation from X-POD.
And we confirmed that the sensing data were correct.
Therefore we conducted data sensing for 2 hours.
SEEDS will not transmit CW and FM packet for 2 hours until 2008/08/12 14:45 (UTC).
1st pass : The batteries voltage 4.13[V]
We operated CW and FM packet.
2nd pass : The batteries voltage 4.11[V]
We operated CW and sensing.
The latest Two Line Element was here.
Thank you.
We had 2 passes in this evening.
We finished downlink the sensing data of 30 minites after separation from X-POD.
And we confirmed that the sensing data were correct.
Therefore we conducted data sensing for 2 hours.
SEEDS will not transmit CW and FM packet for 2 hours until 2008/08/12 14:45 (UTC).
1st pass : The batteries voltage 4.13[V]
We operated CW and FM packet.
2nd pass : The batteries voltage 4.11[V]
We operated CW and sensing.
The latest Two Line Element was here.
SEEDS
1 32791U 08021J 08225.18872354 -.00000080 00000-0 -32599-5 0 1140
2 32791 097.9871 284.9259 0015466 317.1536 042.8470 14.81299860 15663
Thank you.
IojHjdvecC wrote: